CMa
-
(SMMC 7.60) Prepare a Demolition & Site Protection Plan
CMb
-
(SMMC 7.60) Salvage Reusable Materials & Separate Recyclables from Demolition
(Recommended as part of Demolition and Site Protection Plan. Not
Required)
CMc
-
(SMMC 7.60) Inventory, Mark & Protect Topsoil, Trees & Vegetation
to be Retained (Recommended as part of Demolition and Site
Protection Plan. Not Required)
CMd
-
(SMMC 7.10.060)
Prepare a Stormwater Control Program for the Construction
Site
CMe
-
(SMMC
7.60) Recycle Construction Waste, & Designate a Site Waste-Management
Person
CMf
-
(SMMC
5.08.150(b), 7.10.040) Provide Safe
Storage, Worker Training
& Spill Cleanup Procedures for Hazardous Materials.