CMa
-
(SMMC 7.60) Prepare a Demolition & Site Protection Plan
CMb
- (SMMC 7.60) Salvage Reusable Materials & Separate Recyclables from Demolition
(Recommended as part of Demolition and Site Protection Plan. Not
Required)
CMc
- (SMMC 7.60) Inventory, Mark & Protect Topsoil, Trees & Vegetation
to be Retained (Recommended as part of Demolition and Site
Protection Plan. Not Required)
CMd
- (SMMC 7.10.060) Prepare a Stormwater Control Program for the Construction
Site
CMe
- (SMMC
7.60) Recycle Construction Waste, & Designate a Site Waste-Management
Person
CMf
- (SMMC
5.08.150(b), 7.10.040) Provide Safe
Storage, Worker Training
& Spill Cleanup Procedures for Hazardous Materials.
SMMC 8.108 Improved energy performance above California Title 24
requirements.
Legend:
Environment :how well a Practice addresses environmental.,
health and resource-conservation issues.
Low
Moderate
High
(Slightly beneficial; Beneficial; Best practice)
Ease of Use: how easily a given
Practice can be implemented in design and construction.
Low
Moderate
High
(Easy; Moderate; Difficult)
Benefits: benefits of a Practice
besides reduced environmental, health or resource impacts, e.g. social
and livability benefits of pedestrian amenities.
Low
Moderate
High
(Slightly beneficial; Beneficial; Best practice)
Capital Cost: the effect of a Practice
on total construction cost, relative to current Southern California
practice.
Low
Moderate
High
(Low-cost; Moderate cost; High cost)