Search

Help Advanced

Green Building
Requirements
Guidelines

Introduction
Siting and Form

Landscape

Transportation

Envelope and Space Planning
Materials
Water Systems

Electrical Systems
HVAC Systems
Control Systems

Construction Management

Introduction
Reqd/Suggested Practices
Demolition Plan
Reuse Materials
Topsoil/ Trees/ Vegetation
Stormwater Control
Site Waste-Management
Safety Procedures
Reuse Waste
Material-Conservation
Materials On-Site
Pesticides
Low Pollution Equipment
Protect Occupants
Worker Exposure
Procedures Prior Occupancy
Cleaning
Commissioning
Appendices

Case Studies
Additional Resources
Site Map

Schedule Potential Indoor Air-Polluting
Operations to Reduce Occupant & Worker Exposure

If possible, schedule the following types of remodeling work for times when the building is unoccupied:

  • dusty operations, such as interior demolition, sanding and ceiling tile removal
  • operations releasing volatile chemicals, such as gluing, applying paints and finishes, and caulking
  • operations releasing fibers, such as installing or removing insulation

Operations releasing volatiles should be planned to allow as much curing time as possible before occupants return. For example, work done on Friday evening before a long weekend provides an effective curing period for many liquid finishes if ventilation is adequate. Work done at night, but completed just before opening hours in the morning, may not protect occupants at all, but rather expose them to peak levels of air pollutants.

Schedule installation of high-emission interior wet products such as adhesives, paints and caulking as early as possible to allow curing time before installing adsorptive materials and prior to occupancy. Provide excess ventilation during application and for two to five days after to reduce residual vapors from volatile products. Dust clean-up requires far less time than volatiles curing. Exposure to dust may be minimal only one hour after dusty operations if air exhaust, filtration and clean-up are effective.

Delay installation of adsorptive materials such as carpet, porous ceiling tile, fabric, fabric-covered panels and upholstered furniture. This minimizes the amount of pollutants remaining in the space, which these materials adsorb and later re-emit.

Cautions

  • Volatiles exposure may still be high several days after application of some products.
  • On some types of projects, scheduling is very tight and there is little room to shift these operations.
  • Careful attention to safe materials selection can reduce exposure. Emissions strength

 