| Required
Practices |
Environment
|
Ease
of Use
|
Benefits
|
Capital
Cost
|
| CMa
- Prepare a Demolition & Site Protection Plan |
|
|
|
|
| CMb
- Salvage Reusable Materials & Separate Recyclables
from Demolition |
|
|
|
|
| CMc
- Inventory, Mark & Protect Topsoil, Trees &
Vegetation to be Retained |
|
|
|
|
| CMd
- (SMMC 7.10.070) Prepare a Stormwater Control Program
for the Construction Site |
|
|
|
|
| CMe
- Recycle Construction Waste, & Designate a Site
Waste-Management Person |
|
|
|
|
| CMf
- (SMMC 5.08.150(b), 7.10.040) Provide Safe Storage,
Worker Training & Spill Cleanup Procedures for Hazardous
Materials. |
|
|
|
|
|
|
|
|
|
| Suggested
Practices |
|
|
|
|
| CM1
- Crush Waste Concrete & Masonry for Reuse |
|
|
|
|
| CM2
- Use Material-Conserving Construction Practices |
|
|
|
|
| CM3
- Select Safe Materials for Use On-Site |
|
|
|
|
| CM4
- Use Integrated Pest Management (IPM) to Minimize Pesticide
Use in Construction |
|
|
|
|
| CM5
- Use Energy-Efficient Site Lighting & Controls
& Low-Pollution Equipment |
|
|
|
|
| CM6
- Isolate Construction in Occupied Buildings to
Protect Occupants |
|
|
|
|
| CM7
- Schedule Potential Air-Polluting Operations to
Reduce Occupant & Worker Exposure |
|
|
|
|
| CM8
- Flush with Full Outdoor Air for Seven Days Prior
to Occupancy to Protect Occupants |
|
|
|
|
| CM9
- Thoroughly Clean Interiors, Building Cavities
& HVAC Systems Prior to Furniture Installation &
Occupancy |
|
|
|
|