Search

Help Advanced

Green Building
Requirements
Guidelines

Introduction
Siting and Form

Landscape

Transportation

Envelope and Space Planning
Materials
Water Systems

Electrical Systems
HVAC Systems
Control Systems

Construction Management

Introduction
Reqd/Suggested Practices
Demolition Plan
Reuse Materials
Topsoil/ Trees/ Vegetation
Stormwater Control
Site Waste-Management
Safety Procedures
Reuse Waste
Material-Conservation
Materials On-Site
Pesticides
Low Pollution Equipment
Protect Occupants
Worker Exposure
Procedures Prior Occupancy
Cleaning
Commissioning
Appendices

Case Studies
Additional Resources
Site Map

Thoroughly Clean Interiors, Building Cavities &
HVAC Systems Prior to Furniture Installation & Occupancy

Prior to furniture installation and occupancy, thoroughly clean interiors, including cavities affected by construction, such as ceiling plenums.

After cleaning of interiors and prior to occupancy, vacuum HVAC ducts using compressed air or other mechanical means to dislodge debris and replace the air filters used during construction.

Ensure that cleaners used are selected for low toxicity and odor and do not emit toxic air pollutants, or they may prompt complaints. The health purposes of the final cleaning should be emphasized to cleaning staff.

Coordinating the final cleaning with the building or construction area flush-out recommended in CM8 will reduce impact on the construction schedule.

Clean or replace building HVAC system filters as part of the cleaning procedure prior to occupancy.

Cautions

  • Cleaning steps must be specified in contract documents.
  • If furniture installation cannot be delayed, require taped drop cloths on all exposed furniture during final construction and clean-up.
  • Ensure that low-toxicity cleaning products are specified in the contract.

 

 